What kind of a maintenance schedule should I follow for my SA series transformer?
Equipment Required:
- Digital Multimeter
- Frequency Counter
- Oscilloscope
Transmitter - Every 6 Months
At Commissioning record P.A. Amps and P.A. Volts
- Forward Power 100% (See Section 6.1.6)
- P.A. Amps. At 100% power in CARR. Mode
[25 Watt = 0.8 to 1.3 Amps]
[50 Watt = 1.1 to 1.6 Amps]
[100 Watt = 1.5 to 2.3 Amps]
Record Value ______ - Modulation % 90% (See Section 5.9)
- The carrier frequency should be checked and adjusted (if needed) (Refer to section 6.1.2)
- The Tone Key PWB should be check for 400 Hz or 1020 Hz (Refer to section 6.1.3)
- The Keyer should be Checked and adjusted (if needed) (Refer to section 6.1.4)
- Meters should be check and adjusted (if needed) (Refer to section 6.1.7)
- The monitor PWB should be checked for half power, no tone, and Continuous shutdowns and adjusted (if needed) (Refer to section 6.1.10)
- Check for water ingress
Coupler - Every 6 Months
At Commissioning record Coarse Taps, Fine Taps, Impedance, and Tuning Amps
- Check Tuning Amps If different from initial setting refer to section 5.5
- Check for water ingress
Antenna -
Every 6 Months
- Tighten turnbuckles and down leads (where applicable)
- Check for corrosion on all connections
Yearly
- Polish all insulators and fiberglass with SAC silicon polish Part # 9P610001 (Note: This will be required more often in a high salinity environment.)